Browse articles
- Practice details
- Brand your documents: logo, fonts, colours and artwork
- Project numbering
- Custom fields
- Task statuses
- Task types
- Adding an office
- Office billing details
- Give your people a home entity
- How permissions work
- Setting someone's access level
- Practice finances access
- Rates access
- Access to one project
- Project role access
- Project admin access
- Team role access
- What each access switch controls
- Contacts access
- Project creation access
- Expense claims access
- Report access
- Staff management access
- Sign-in security
- Verify your sending domain
- Activity and undo
- Connect your own AI agent
- Moving and linking stages
- Critical path and automatic dates
- Large projects
- How do I move a task to another stage?
- Billing milestones
- Checklists and notes
- Your projects
- Tracking schedule slips
- How do I change a project's status?
- How do I rename a project?
- Closing a project
- How do I archive or complete a project?
Construction cost fees
Price a stage the way a lot of architecture fees actually work: as a percentage of the estimated construction cost, so the fee moves whenever that estimate does.
What you'll achieve
Make a stage's fee work itself out from the project's construction cost, so it updates whenever the estimate or the percentage changes.
You'll end up with: A construction cost worked out from cost per square metre and floor area, and a stage fee that recalculates the moment the rate, the area or the percentage changes.
Before you start
If your contract says the fee is a percentage of construction cost, the fee should move with the estimate. You'll know it worked when the stage fee is your share of the construction fee: here a Concept Design fee of A$480,000, a quarter of 8% of A$24,000,000.
A fixed fee, or a fee group with one agreed price, works when a number is genuinely fixed. Most early-stage fees are not. Quoting a percentage of the estimated construction cost is the standard way architects price a commission, precisely because that estimate is still moving. A quantity surveyor revises it after a cost check, the client's budget shifts, or the scope grows during Design Development. Every time it does, a fee quoted as a flat dollar figure needs someone to remember to re-quote it. Miss that once and you're invoicing off a number the project outgrew months ago.
Pricing from the construction cost removes the "someone has to remember" part. Update the estimate, and every fee that reads it updates too.
We'll price the Concept Design stage of Riverside Apartments at a quarter of an 8% construction fee. Its construction cost comes from a rate of A$4,000 per square metre on 6,000 square metres of floor area: A$24,000,000.
The construction cost belongs to the project, not to a stage
Construction cost, the fee percentage and the fee they give are facts about the whole project, so Monument keeps them as project custom fields. Monument's built-in template starts you with three:
- Construction cost: the client's or quantity surveyor's estimate, in dollars.
- Fee percentage: the percentage your contract agrees, as a plain number. Type 8 for 8%.
- Construction fee: worked out for you. Its default value is a formula, construction cost times fee percentage divided by 100, so on every project it follows the other two.
They sit at the top of the Brief's Financials, above the stages, because the stage fees read them. Each stage then takes its share with a Formula fee that reads the construction fee, such as {custom.construction_fee} * 25 / 100 for a stage worth a quarter of it.
These are a starting point, not a fixed model. Early on, a quantity surveyor often prices a job per square metre of floor area. Add a Cost per square metre field and a Floor area field, then give Construction cost a formula on this project: cost per square metre times floor area. You build it from the field itself, on the Brief, with the same lines as everywhere else in Monument: pick a field, choose times, pick the next field. Only this project changes. Every other project keeps following the practice's default for that field.
Under each field worked out by a formula, a small label says where the formula comes from. Default formula means the field follows the practice's default. Formula means this project has its own. A field you type a number into shows that number instead.
A new field added from a project takes that project's value as its default too. Keep it when the figure is a sensible starting point for every project, such as your usual rate per square metre. Clear it when every project has its own figure, such as floor area. Tick Show in the project creator so New project asks for the figure as it creates the project.
This split is the point. The estimate is entered once, in one place, and nobody types a stage fee as a dollar figure. Change the estimate or the percentage, and Construction fee and every stage fee that reads it move together.
Build it
- 1
Open Riverside Apartments, then Financials on its Brief.
- 2
Click New custom field. Name it Cost per square metre, choose Currency, enter 4000 for this project, keep it as the Default value, and click Create.
- 3
Add Floor area the same way, as a Number with 6000 on this project. Clear its Default value, tick Show in the project creator, and click Create.
- 4
Click the edit icon beside Construction cost. Click Add a line and pick Cost per square metre. Add another line, set it to times, pick Floor area, and click Use formula.
- 5
Construction cost reads A$24,000,000, with Formula underneath. Type 8 into Fee percentage. Construction fee fills in by itself: A$1,920,000.
- 6
Click Revenue on Concept Design. Open the Fixed Fee and click Remove this fee, because the percentage fee replaces it.
- 7
Click Add a fee, choose Formula, and name it Design fee. Click Edit as text and enter {custom.construction_fee} * 25 / 100, or build the same formula line by line: Construction fee, then times 25%.
- 8
Click Done, then Save. The Design fee is A$480,000.
To have every new project work its construction cost out this way, set the formula as the field's default value instead, in Settings, under Projects, Custom fields. Projects that have their own value or formula keep it.
The point of doing it this way
This is the moment that plays out on every real project. The client renegotiates the percentage down to 7.5. Type 7.5 into Fee percentage and Construction fee drops to A$1,800,000 straight away, and the Design fee follows to A$450,000. A revised floor area or rate works the same way: update it, and Construction cost and every stage priced from it catch up. Nobody re-quotes anything, because the fee was never a typed number. It was always a share of the construction fee.
Once a stage's fee is a formula over the construction fee, the arrangement is reusable. Save it as a template and every new project starts with your standard construction-cost pricing wired in, and only needs its own estimate and percentage. See pricing templates.
Troubleshooting
- Construction fee stays empty. It needs both Construction cost and Fee percentage. Fill in whichever one is blank.
- The fee is a hundred times too big. Fee percentage is a plain number: type 8, not 0.08 or 8%. The default formula already divides by 100.
- The stage fee looks too high. If the Fixed Fee is still there, it adds into the total alongside the formula fee. Remove it so only the formula counts.
- A field says "Formula" instead of "Default formula". This project has its own formula for that field, so changes to the practice's default do not reach it.
- A field should follow the default again. For a typed number, clear the box and click away. For this project's own formula, click the edit icon, click Enter a value, and click away without typing. While you are still in the box you can type a new number instead, and that number is kept for this project.
- The fields are missing. A practice that deleted them, or was set up before they existed, can add them in Settings, under Projects, Custom fields. See custom fields.
Where this fits next
Next, if your contract is a monthly retainer. To reuse this pricing on the next project, see pricing templates.